Anticipated project Deliverables: • Trail design and engineering to ensure ADA design compliance and pedestrian bridges for all water crossings. • Design of appropriately-sized stormwater management facilities to treat the increase in impervious surface. • Forecast and suggested timeline for all necessary approvals. • Establishment of a logical, phased plan for the construction of the trail system with corresponding time and cost estimates for each phase of development. • Preparation of final construction document plan set and corresponding bid specifications. • Assistance with the bid phase, including preparation of bid specifications (as referenced above), bid advertisement, attendance at the pre-bid meeting, and responses to all bidrelated questions during and after the mandatory pre-bid meeting. • Updated opinion of probable construction costs