Specifications include, but are not limited to: A. Contractor shall provide all labor, tools, materials, equipment (including hoses, heavy duty mechanical broom street sweeper), protective covering, insurance, transportation, licenses or permits necessary to perform all work as described herein. B. Contractor shall provide a heavy-duty mechanical broom street sweeper, e.g., Elgin Eagle or equivalent, to provide sweeping service to the entire parking lot area and roadway lanes. Contractor to provide a mobile or heavy-duty dustless power vacuum attachment capable of removing all debris and leaves from the paved parking area, fence line, etc. Hand blowing will be required in areas the sweeper will not reach. C. Contractor to provide service twice monthly. Contractor shall notify the CHP on-site contact the date and time of service one week prior to the work being completed D. All Contractor to ensure that all debris is removed from the premises including the refuse and debris that may accumulate around the building, in the parking lot, and roadway lanes. This shall include removal of debris and leaves in corners, behind wheel stops, along all fence lines, and recessed areas which are accessible by the mobile unit. E. All services shall be performed by trained competent workers F. Any work found unsatisfactory shall be redone before the next scheduled service at no additional cost to the State. In the event of equipment failure, Contractor must respond with back-up personnel and power sweeper within two (2) working days at no additional charge to the CHP. Contractor must respond to all recalls within 24 hours after notification from the CHP on-site contact or the CHP Facilities Coordinator. After two (2) recalls for unsatisfactory work, the State reserves the right to terminate the contract G. During inclement weather, the Contractor is to schedule an appointment with CHP onsite contact for make-up service. H. All quotations for additional services not covered under this agreement are to be provided at no cost to the State by the Contractor. I. Contractor shall take all necessary precautions to protect service locations. Any damage caused by Contractor to state equipment, materials, or other priority shall be repaired or replaced by Contractor to the satisfaction of the State at no cost to the state. The State may, at its option, repair any damage and deduct from Contractor the cost thereof. J. Contractor agrees to submit one (1) original and one (1) copy of all invoices, clearly indicating the agreement number, once a month to the location where service was provided.