ROADWAY ITEMS: QUANTITY UNIT MOBILIZATION 1.000 LS CLEARING AND GRUBBING 1.000 LS REMOVAL OF PIPE (ALL SIZES) 40.000 LF UNCLASSIFIED EXCAVATION (FM) 685.000 CY BORROW EXCAVATION(CONTRACTOR FURNISHED, LVM, CLASS 7) 2,750.000 CY STRUCTURE EXCAVATION 550.000 CY TEMPORARY STREAM DIVERSION 1.000 EA GRANULAR MATERIAL (LVM), (CLASS 6, GROUP C) 933.000 CY SIZE II STABILIZER AGGREGATE, COARSE 160.000 CY CLASS B STRUCTURAL CONCRETE 119.790 CY REINFORCING STEEL 21,129.000 LB RIGHT-OF-WAY MARKERS (TYPE II) 13.000 EA MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF EROSION CONTROL ITEMS: AGRICULTURAL LIMESTONE 2.000 TON COMMERCIAL FERTILIZER (13-13-13) 1.000 TON SEEDING 1.000 AC VEGETATIVE MATERIALS FOR MULCH 3.000 TON SOLID SODDING 50.000 SY TEMPORARY SILT FENCE (TYPE II) (AOS 0.15-0.84) 1,405.000 LF WATTLES, 20" 100.000 LF LOOSE RIPRAP, 300 LB. 100.000 TON GEOTEXTILE UNDER RIPRAP, TYPE V, AOS <0.43, NON-WOVEN 100.000 SY