The project includes the following Work: ꞏ Trenching and boring for the installation of cabling and raceways as outlined in plans. ꞏ Excavation for the placement of shunt box, foundations, and signal cabin. ꞏ Assembly and mounting of gate and cantilever masts, gate arms, flashers, and bells. ꞏ Completion of track, power, and signal connections as detailed in circuit drawings. ꞏ Installation of track bonds across all non-insulated joints within the approach of the crossing. ꞏ Installation of insulated joint bars and insulated switch rod kits. ꞏ Execution and documentation of all Federally required testing and placing into service activities. ꞏ Performance of closeout activities include completion and submittal of detailed test plans and as-built plans, as well as site cleanup, including all excavation filling and final grading.