Specifications include, but are not limited to: A. Contractor shall confirm that all furniture and personal belongings have to be removed from the house/work area prior to the start of the project. B. Contractor shall coordinate access to the home for any visual inspections and clearance sample testing to be performed. C. Contractor shall be responsible for completing all work specified in the Design Plan including any and all revisions made to the design for the purpose of the project within contract dates specified. This specifically includes the placement of the decontamination unit. D. Contractor shall perform an ASTM approved tape method before applying any encapsulating paint to a building component to ensure proper adhesion to the substrate. E. Contractor shall store debris in a secure area until final disposal. Dispose of in accordance with the Mine Department of Environmental Protection’s Lead Management Regulations. F. Contractor shall be financially responsible for all associated sampling costs such as administrator labor, travel, postage, and laboratory analysis of the dust samples if interim or final clearance samples fail. G. Contractor shall repair or replace any building components damaged during the project to match existing building components. H. All product warranty information must be given to the City of Auburn and the home owner prior to final payment of project. Product labels (stickers) showing Energy Star Compliance will remain in place until inspected and approved by Lead Design Consultant. I. A written notification plan will be developed by the Contractor and provided to the owner/tenant, the Administrator and the City of Auburn. J. Contractor shall provide a final abatement report to the City of Auburn, Administrator, and the homeowner within 30 days after project completion in accordance with DEP Chapter 424, Section 6.G. K. The use of a “Booth” or “Mini-Containment” system will be determined by the Lead Design Consultant and shall be in writing.