Specifications include, but are not limited to: The Installation of Electric Vehicle DC Fast Chargers should encompass the following: • Project Management o Initial Site Schedule Provision/Discussion Create, propose, and manage site schedule progression o PM Coordination Weekly Field Reporting & Scheduling Updates (Silver Comet to check-in as needed) o Sub-Contractor Coordination Direct Management of Sub-Contractors On-Site o Quarterly Leadership Check-In • Permitting, Design, & Engineering o Permits will be readily available (owner provided) upon arrival on site • Installation o Transformer & Switchgear Panel Contractor to install utility-supplied transformer Contractor to install owner-provided switchgear panel Dip pole to transformer connection Transformer to panel connection o Charger Installation Contractor to wrap charger with owner-provided wrap Contractor to print and install owner-provided QR-Code on charger Provide and install all reinforced concrete pads for utility equipment and chargers based on the equipment specifications and engineered plans provided • 6” – 3,500 Psi with 18” OCEW #3 Rebar Install and terminate all electrical infrastructure for (4) ABB Terra 184 chargers per engineered plans provided • Includes utility secondary raceways, service rack, service rack equipment and conduits and circuitry for chargers • Install (1) cable management system for each charger Install (1) 2" conduit w/ (1) Cat6 or fiber optic communication cables from EV charger to the data closet located inside the store • Contractor to terminate cat6 inside of the EV charger; interior data closet termination completed by others • Utilization of the existing conduit sleeves under driveways, medians, and islands is recommended and approved by Silver Comet • If the run exceeds 200’ then POE Extension and box is needed...