Specifications include, but are not limited to: 1 Site Plans 1 Lump Sum 2 Mobilization 1 Lump Sum 3 Site Preparation 1 Lump Sum 4 Perimeter Fencing, 6 FT 138 Linear Foot 5 Perimeter Fencing, 8 FT 360 Linear Foot 6 Site Entrance Gate 1 Each 7 Traffic Control 10 Day 8 Site Security 35 Day 9 Construction Entrance 1 Lump Sum 10 Construction Facilities and Temporary Controls 5 Month 11 Erosion and Sediment Control 1 Lump Sum 12 Decontamination 1 Lump Sum 13 Transport and Offsite Disposal of Unused Overburden Material 350 Ton 14 Transport and Offsite Disposal of Decontamination Water 550 Gallon 15 Dust and Vapor Control Implementation 4 Week 16 Vapor Suppressant Foam - Equipment Mobilization and Staging 4 Week 17 Vapor Suppressant Foam Application 275 Gallon 18 Excavation Permitting 1 Lump Sum 19 Overburden Excavation and Temporary Stockpiling 850 Cubic Yard 20 ISCO Planning 1 Lump Sum