Specifications include, but are not limited to: The project consists of replacing the water main on Brown Street beginning at its intersection with Rome Street and ending near the new Carroll County Administration Building site located at 423 College Street. The project will include installation of approx. 1,030 LF of new 8” DIP water main; saw-cutting and demolition of existing pavement, drives, and sidewalks as necessary for installation of the water systems; relocation of existing utilities where necessary; pavement, curb, driveway, and sidewalk replacement; restriping roadway where pavement is replaced to match existing striping; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The contractor is expected to coordinate all lane/road closures required during construction with the City Engineer. The contractor will be required to maintain good communication and coordination with Project Engineer and City Engineer throughout construction of the project.