Specifications include, but are not limited to: Part One: Inspection and Reporting. a. A pre-demolition Asbestos inspection and Building materials Survey: Conduct a pre-demolitions asbestos inspection and building materials survey that satisfies that requirements of the United States Environmental Protection Agency's National Emission Standard for Hazardous Air Pollutants (40 CFR Part 61), the Louisiana Air Quality Regulations LAC:33:III and Chapter 51, section 5151B) and HUD 24 CFR, Part 35. The inspection survey should be conducted in a manner sufficient to identify all suspected asbestos containing materials. b. Asbestos Sampling and Analysis Plan: Prepare and implement and asbestos sampling and analysis plan for each subject property.