All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: Louisville Water Company is requesting Bids The referenced project consists of the supply and install a total of 2,900 LF of water main, including supply and install of 350+/- linear feet of 4-inch Pressure Class 350 ductile iron water main, using traditional trench installation techniques 2,550+/- linear feet of 6-inch Pressure Class 350 ductile iron water main, using traditional trench installation techniques. Also included with the project is the supply and installation of 4 fire hydrants, and the supply and transfer, renewal, relocation, or discontinue of 51+/- customer services. Fire hydrant removal, main cut and plugs, and restoration on and along Project Limits as stated above shall be included. Final milling and paving is not in contract. Contractor shall supply and install all materials required for the completion of this project.