Specifications include, but are not limited to: Existing air terminal units are in need of new controllers as well as programming and associated work. Contractor to provide and install a new JACE 8000 equipment running Tridium s Niagara 4 framework. New JACE to be located in mechanical room in the location of the existing controller. Provide Tridium licenses and Service Maintenance Agreement as necessary for JACE installation. Replace equipment controllers as indicated on the floorplans with BACNET-MSTP protocol control devices. Provide any necessary networking and communication cabling, power transformers and accessories as necessary to physically connect existing equipment controllers with JACE controller. As part of this project, histories are intended to be compatible with Commonwealth Energy Management and Control System policies, configuration and naming convention. It is required to ship data to Tridium Niagara Supervisor for CEMCS export under this scope of work. Mechanical equipment has been identified through the record drawings provided and an anticipated points list has been generated based on this equipment. The contractor shall use this points list as a guideline and as a demonstration of CEMCS standard naming convention. Discover all existing points within the existing BACnet network and other communication networks existing. Estimate of controls points currently available is 260.Provide all controls programming to implement the sequence of operation by the engineer.