This project consists of the Swimming Pool Rehabilitation and New Splash Deck for the Park District of the City of Wishek. This project includes several schedules: Schedule I: This schedule includes renovations of the existing 130’ x 40’ concrete pool by removing the existing decks, fences, filtration system, concrete gutters and deck equipment. The improvements will include a new stainless steel perimeter gutter system, new 425 gpm high rate sand filtration system, new backwash disposal system, new PVC pool tank liner, new deck equipment the relocation and conversion of the existing pool heater, new chemical feed systems, new 20’ x 30’ concrete equipment area with a 8’ chain link fence enclosure, new concrete decks with a deck drain system, new perimeter chain link fence, new water and sewer services with street repair, new electrical service and miscellaneous items for complete installation. Schedule II: Installation of Owner provided splash deck features including the concrete foundations and the concrete for a 2500 SF splash deck, install an Owner provided manifold system with feature controller, with installation of an Owner provided water treatment system, installation of an Owner provided chemical feed system, install an Owner provided 4000-gallon storage tank with connection fittings, provide and install a 48” strainer MH with internal piping, provide and install all the supply and return piping for the operation of the splash deck, install the concrete decks around the splash deck , install the retaining wall around the splash deck, provide the necessary electrical service installation and miscellaneous items for complete installation to make the splash deck operational.