• Purpose: The exiting structure, built in 1939, has a sufficiency rating of 39.7. It is 69 FT in length, and is a single span bridge with steel beams and a poured concrete deck. The existing structure has advanced deterioration on the deck and substructure, while the superstructure has section loss. For these reasons, replacement of the structure is critical for the safety and well-being of the residents of Fulton County. • Project Components: The proposed structure will be approximately 100 FT in length, 30 FT in width, with a 40 degree skew. The existing structure will be removed, and replaced with a single span, reinforced concrete deck on steel beam structure. The superstructure will be supported by spill-thru abutments and steel H piles. Minor roadwork will be included to tie in approaches, giving the total project an approximate length of 350 FT. Erosion Control features, Guardrail, and other various work will also be included in the project scope. • Timetable: This project will be on the 11-8-2024, or 1-17-2025 letting; allowing for late winter/early spring 2025 construction. • Expected Problems: Close coordination with the traveling public will be required, as this bridge is adjacent to St. David city limits, Spoon River College, and agricultural routes. • Project Budget: This will be discussed in further detail with the selected firm at the time of contract negotiation, once final plans are available.