The work will consist of rehabilitation of existing RCP and VCP gravity trunk line in the Oconee Joint Regional Sewer Authority’s (OJRSA) system within existing OJRSA easements and South Carolina Department of Transportation (SCDOT) Right-of-Ways ROW. The work consists of approximately 20,685 LF (8” – 6,000; 12” – 1,700; 15”- 12,000; 18” – 350 LF; 30” – 235 LF) of Cured-In-Place Pipe, seven (7) point repairs varying from 8” to 30”, approx.. 700 VF of manhole rehabilitation using calcium aluminum cementitious liner system and select manholes with epoxy, pressure grouting interior manholes for leak prevention, replace and removal of select frame and covers, select manhole cone replacement, and flow control/bypass pumping.