The Project includes the following Work: Work of the Project includes: • Development of a gravel source for pipeline bedding and road repairs or importation of required project materials. • Phase 1A: construct the water main with all valves and appurtenances from Station 0+00 to 7+60 and provide water service connections for 8 homes. • Phase 1B: construct the water main with all valves and appurtenances from Station 104+15 to 110+62 and provide water service connections for 3 homes. • Phase 1A Additive Alternate: construct the water main with all valves and appurtenances from Station 7+60 to 10+46. • Phase 1B Additive Alternate: construct the water with all valves and appurtenances from Station 100+00 to 104+15 and provide water service connections for 1 home, and 2 stub-outs. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with water service systems.