Specifications include, but are not limited to: Scope of Work Measure all dimensions and number of stories including all basements, out buildings and garages. Use Safe Work Practices to tear down, demolish, raze, remove, and cart away all materials to appropriate dumping facility comprising of said building(s) components, to ground level or basement level, if said building(s) has a basement, including all concrete slabs, floors, basement walls, foundations, footings, and sidewalks, steps, patios and driveways, etc. to leave only ground and soil on the site. MOST RETAINING WALLS WILL REMAIN UNLESS OTHERWISE SPECIFIED AT THE PRE-BID OR IN THE SCOPE OF WORK. Remove all debris of whatever charter arising from the demolition of the building(s) including all contents, demolition debris, debris in the yard, out buildings and haul away to leave the entire premises cleaned to ground level and seed and straw. The contractor is required to clear the entire lot of all undergrowth, small trees, damaged trees, and dead trees. Standing healthy trees will not be removed unless specified. When removing trees, the Contractor is required to remove tree stumps and fill in depression with dirt or grind the stump below grade. Clear fence lines, poles, or hedgerows that joins property line. The Contractor must furnish everything to complete the work including but not limited to, all equipment, trucks, tractors and related equipment and materials, labor, Insurance and Workers Compensation and all DHEC Permits and City and State Permits and State and License to complete the work. Fill all crawl spaces or basements or septic tanks holes with compactable red clay. Existing dirt on a lot may be used to level the lot if it does not cause erosion, depressions, or other drainage problems.