Specifications include, but are not limited to: The Contractor shall use specified abatement methodologies during the work. The Contractor shall abide by all worker protection and safety specifications as outlined in the Contract. Contractor shall provide, at its expense, electrical service connections sufficient for the equipment to be used during abatement. Plumbing connection shall also be provided, at Contractor's expense, so that adequate services are available for washing down the areas after abatement and for personal hygiene. Construction, alteration and/or repair, painting and decorating includes but is not limited to the following: Demolition or salvage of structures where lead or materials containing lead are present; Removal or encapsulation of materials containing lead; New construction, alteration, repair, or renovation of structures, substrates, or portions thereof, that contain lead, or materials containing lead; Installation of products containing lead; Lead contamination/emergency cleanup; Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed, and Operations associated with the construction activities described in this paragraph.