Specifications include, but are not limited to: Req. approx. 700 ft2 temp sign; 2 ea PCMS; 160 hr flag; 150 ea RR flag; 3,500 ft sed barr; abandon monitor well; const surv work; 2,550 yd3 exc; 24,000 yd3 emb; 300 yd2 subg stabilzn; 8,625 yd2 geotext; 2,100 yd2 subg reinf geogrid; 568 yd3 riprap; 306 ft vid insp; 376 ft pipe; 89 ft drain curb; br rem; 400 yd3 struct exc; 500 yd3 gran struct bckfll; 252 ft drill shaft; 173,650 lb reinf; 543 yd3 str conc; 1,021 yd2 saw cut text; 136 yd2 reif conc br appr slab; 10 ea bearing device; 60 ft strip seal; 725 ft vert conc parapet; 306 ft ornamental protect screen; 1,600 ft precast prestress girder; 300 yd2 CPPR; 3,800 ton aggr base; 1,200 ton ACP; 4 ea asph appr; 1,207 ft gr rl; 2,000 ft pvmt marking paint; 90 fbm wood sign post; 20 ft2 sign; bioretention pon (680 yd2 drain geotext; 33 yd3 riprap; 100 yd3 gran drain backf; 200 yd3 water qual mix; 260 ft pipe; 1 yd2 conc bottom marker; 2 acre seed; 11,740 ea tree; 2,700 ft fence. This project requires Railroad Insurance. Completion Time: October 31, 2025. Class of Work: Bridges and Structures.