Specifications include, but are not limited to: 1. Contractor shall buy scrap metal from Tennessee Tech. Contractor shall provide hauling services as part of the agreement and shall also receive scrap metal as delivered by Tennessee Tech. 2. Hauling shall be done on an “as requested” basis. Hauls by the Contractor shall be scheduled Monday through Friday between 7:00 am and 3:00 pm. Container shall be picked up, taken directly to Contractor’s business location, emptied, and empty container returned to Tennessee Tech (note: container owned by Tennessee Tech). 3. Contractor shall furnish a tonnage receipt for every haul, whether hauled by Tennessee Tech or Contractor. The following information must be provided on each receipt: Description of material/classification of metal(s) -Gross tonnage -Tare tonnage -Net tonnage -Date material hauled and received at facility -Truck driver’s name and signature 4. Contractor shall pay Tennessee Tech, at a minimum, once a month (every 30 days) for all scrap metal received by Contractor from Tennessee Tech for that month. Payments shall be due no later than the 20th day after the close of each month. Payments shall be remitted to the TTU Business Office, Box 5037, Cookeville, TN 38505. All payments should reference the contract number that will be assigned. 5. Contractor shall operate in compliance with OSHA and DOT regulations. 6. Contractor shall possess and keep in force all licenses, business permits and other permits required to perform the services of this agreement. 7. If requested, Contractor shall provide summary reports detailing transactions for a specified time period.