Specifications include, but are not limited to: A. Contractor shall provide a heavy-duty mechanical broom street sweeper, e.g., Elgin Eagle or equivalent, to provide sweeping service to the entire parking lot area and roadway lanes. Contractor to provide a mobile or heavy-duty dustless power vacuum attachment capable of removing all debris and leaves from the paved parking area, fence line, etc. Hand blowing will be required in areas the sweeper will not reach. B. Contractor to provide service once every two (2) weeks not to exceed two times per month. In the event, the month will have more than four (4) weeks, the Contractor shall provide the service on the first week following the month. Contractor shall notify the CHP on-site contact the date and time of service one (1) week prior to the work being completed. C. Contractor to ensure that all debris is removed from the premises including the refuse and debris that may accumulate around the building, in the parking lot, and roadway lanes. This shall include removal of debris and leaves in corners, behind wheel stops, along all fence lines, and recessed areas which are accessible by the mobile unit. D. All services shall be performed by trained competent workers. E. Any work found unsatisfactory shall be redone before the next scheduled service at no additional cost to the State. In the event of equipment failure, Contractor must respond with back-up personnel and power sweeper within two (2) working days at no additional charge to the CHP. Contractor must respond to all recalls within twenty-four (24) hours after notification from the CHP on-site contact or the CHP Facilities Coordinator. After two (2) recalls for unsatisfactory work, the State reserves the right to terminate the contract.