Specifications include, but are not limited to: 2.1.1 Data Compilation: Data compilation to include the review of: 1. Greenways and Trails Masterplan Memorandum of Understanding (MOU). 2. Existing Park Master Plan. 3. MTPO and City of Topeka Bikeways Master Plan, Pedestrian Master Plan, and Complete Streets policies. 4. Existing Shawnee County and City of Topeka data. 5. County GIS aerial photographs, mapping, contour mapping and specialty maps for the areas. 6. Near-term and proposed SCP+R maintenance repair and rehabilitation projects within the parks and trails system. 7. ADA Accessibility Evaluation (2021) 8. Review of existing water, wastewater and storm water system GIS and asset management data (Cityworks) and (City of Topeka Water Pollution Control Division) as it relates to the Greenways and Trails Plan. 9. Review of existing transportation system maps and pavement inventory/condition data for the service area (City of Topeka and Shawnee County Public Works Departments). 10. Plans including Kansas river navigation and access points. 11. The Consultant Team would be responsible for public engagement surveys and meetings to gather feedback. 2.1.2 Reviews and Input: Following acceptance of a working draft, the plan will be presented to the BCC and the SCP+R Advisory Board for review and comment. The draft Master Plan would be updated to reflect pertinent comments. 2.1.3 Project Deliverables: (1) Results of all public engagements, (2) Current trails and greenways inventory and assessment, (3) Projection of future trails and parks including maintenance and staffing projections, and (4) the new Greenways and Trails Master Plan.