Specifications include, but are not limited to: • Evaluate the condition of the building exterior to determine appropriate mounting installation manner to the historic nature of the structure. • Remove existing hardware where applicable. • Provide, or manufacture steel frame suitable for the awning industry installed securely to the building. • Provide suitable cloth covering suitable for awning industry installed to the steel frame in the pattern/color choice of the building owner with 8” fixed valance. • A separate quote for fixed valance painted graphics shall be provided per unit. (unit being per property address) • Remove all trash and debris from work site • Appendix A describes the listing of locations currently included in the following proposal. Bids are to include all labor, equipment and material required to complete the scope of work. Contractor is responsible for securing all necessary city permits; cost of those permits should be included in this bid.