The Contractor shall provide all of the materials and perform all the work described in the Specifications and/or shown on the Drawings. The Chiller and Chilled Water System of the Northern YDC Facility will be removed and replaced per the International Mechanical Code, ASHRAE, Kentucky Building Code with Current Revisions, Americans with Disabilities Act, International Building Code, and National Electrical Code. The Contractor shall remove and take ownership of the existing chiller. The contractor shall disconnect the existing chiller from power and control and, disconnect the existing chiller from piping and mounting. Remove the existing chiller from its installed location and make the location ready for the new chiller described in the following. Make legal and lawful disposal of the chiller, which involves recycling of the unit beginning with refrigerant recovery and dismantling of the assembly for recycling or other appropriate disposition. The Contractor shall provide a temporary Chiller while the existing Chiller is removed and a new Chiller including the Microprocessor controlled, multiple-scroll compressor, air-cooled, chiller of the scheduled capacities as shown and indicated on the Drawings, including but not limited to: chiller package, electrical power and control connections, and chilled water connections. The Owner s preferred daily work schedule shall be Monday-Friday 8 hour/day. There are no Contractor working days on Saturday-Sunday. A 48 hour notification is required for any outage of any existing utility including the Chilled Water and Heating Water Systems. Any damaged utility by the Contractor must be put back into service immediately