Specifications include, but are not limited to: Pre-Design Phase: A. Perform a hydraulic evaluation to determine the required sizes for the new pumps for the booster pump station to have a reliable pumping capacity of 18 MGD and the required pipeline sizes for the booster pump station site. B. Prepare base mapping utilizing an aerial photo background (minimum 1’ resolution). This includes main roadway features, utilities, and other features, as necessary. Aerial photography should be no older than two years and be detailed enough to display road features. C. Perform a utility search of the project site, including but not limited to, water lines, sanitary sewer, storm drain, irrigation lines, gas, electrical, cable, fiber optics, telephone, etc. D. Evaluate the feasibility and cost of the following project options: 1) Enlarging the roof access skylights to accommodate larger pumps and motors. Evaluate whether to maintain skylights or install hatches. 2) Adding an on-site emergency power generator versus adding a connection for a portable power generator. E. Review JVWCD’s design criteria applicable to this project including coatings for all indoor piping and pump heads.