Specifications include, but are not limited to: Test pumping of existing well to determine current yield. Pull existing pump (contractor shall record pump serial number from pump bowl and coordinate with manufacturer to provide existing pump curve) and perform video inspection of existing well. Demolish existing discharge piping and valves and replace with new piping & valves as shown on plan sheets to match up to new pump support base. Pump modifications including: removal, rebuilding, and re-installation of re-built 150 hp motor, install new vertical turbine pump to match existing pump curve using water lubricated pump, entire new water lubricated column assembly, include +/- 240 vertical feet of column pipe, include new 416 SS line shaft, re-use existing pump discharger head, re-build stuffing box, sand-blasting and re-coating of existing discharge head with NSF61 approved epoxy, and demolish existing concrete block pump support base and reconstruct in accordance with Georgia EPD Minimum Standards for Public Water Systems.