Specifications include, but are not limited to: Task 1 (Murase Plaza Equipment Replacement): Fiscal Year 2024-25 – Design, Build, Install, and Test the two water feature systems located in Murase Plaza that operate the runnel and spray deck at Murase Plaza. The City anticipates the schedule for this Task to commence in Fall 2024 and be completed by March 1, 2025. Task 2 (Town Center Park Equipment Replacement): Fiscal Year 2025-26 - Design, Build, Install, and Test the one water feature system that operates the runnel at Town Center Park. The City anticipates the schedule for this Task to commence in Fall 2025 and be completed by March 1, 2026. Task 3 (On-Call Maintenance and Repair): Fiscal Year 2024-25 through Fiscal Year 2028-29 – On-call repair and maintenance services for the water feature systems in both locations (Murase Plaza and Town Center Park).