Specifications include, but are not limited to: Repairing and installing new asphalt on various roads inside the Nearman Creek Power Plant. • Gate #2 Road (Approximately 27,483 SF) o 3” Mill and Overlay of existing road, apply SS1H TAC coat prior to installing new asphalt, repair base as needed. • Gate #3 Road (Approximately 23,308 SF) o 3” Mill and Overlay of existing road, apply SS1H TAC coat prior to installing new asphalt, repair base as needed. • CT4 Road (Approximately 25,154 SF) o 3” Mill and Overlay of existing road, apply SS1H TAC coat prior to installing new asphalt, repair base as needed. • Fleet Parking Area (Approximately 3,290 SF) o Excavate 9” of soil, provide and install 6” MoDot type 5 base rock o Apply SS1H TAC coat, install 3” thick Asphalt Mix • Additional Office Parking (Approximately 1,600 SF) o Excavate 9” of soil, provide and install 6” MoDot type 5 base rock o Apply SS1H TAC coat, install 3” thick Asphalt Mix • De-Min Trailer Area (Approximately 7,020 SF) o Add base rock and compact where necessary o Spray SS1H TAC coat, install 3” Asphalt Mix overlay. • Bottom Ash Silo Road o 4” Mill and Overlay of existing road, apply SS1H TAC coat prior to installing new asphalt, repair base as needed.