Specifications include, but are not limited to: The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Sanitary sewerage system rehabilitation including, but not limited to, replacing clay sewer mains with approximately 1,035-LF of 12” HDPE sewer mains using the pipe burst method as well as sewer lateral replacement and manhole rehabilitation. Water system improvements including, but not limited to, installation of 1,110-LF of 6” C-900 PVC water main, 453 LF of 2” PE water main, connecting to the existing sytem, longside and shortside laterals, and a 6” fire hydrant assembly. Drainage improvements including, but not limited to, installation of 930-LF of 24” roll-over curb and gutter, 835-LF of 24” storm pipe, and 122-LF of 15” storm pipe. The project will also consist of curb inlets, grate inlets, headwalls, pavement replacement, roadway pavement overlay, sediment control, and grassing.