Specifications include, but are not limited to: a) Removal and installation phases: a. Prior to any ground digging, the Contractor shall utilize a utility locator to mark any utilities within the designated work area. They are also responsible for the replacement and removal of any concrete during and after the demolition phase. i. The Contractor must ensure that orange construction fencing is placed around any open holes in the work area. Existing seep drains must be removed, with drain pipes capped and abandoned if present. b. The Contractor is tasked with furnishing and installing two (2) concrete inlet boxes with cast iron frame grates. Alongside this, they must install eight (8) feet of 5-inch channel drain along the sidewalk, directing into the storm drain, and lay approximately 160 feet of 10-inch SDR 35 pipe. c. Lastly, the Contractor shall seed and straw and disturbed ground during the completion of this project. b) Contractor Safety Requirements: The Contractor is to follow all safety requirements under Maryland Occupational Safety and Health Act (MOSHA) for all work conducted at PATX. The Contractor shall follow all codes and recommendations set forth. The Contractor shall work closely with security as digging in the ground will be required around the security fence and must follow the security guidelines...