Specifications include, but are not limited to: This work shall consist of the removal and satisfactory disposal of the specified building(s) together with its steps, patios, sidewalks, driveways, fences, adjacent foundations, interior furnishings, garbage on the premises, etc. which is necessary to fully complete the removal of the building from its site together with furnishing, placing, grading fills, and preparing a seed bed and furnishing, transporting, and placing the required seeds and other materials as required in the seeding operations. Removal operations shall be performed in accordance with the provisions of Article 107.01 of the Standard Specifications for Road and Bridge Construction and shall include all foundations, footings, walks, pavements, slabs, walls, columns, etc. All materials from the building are to become the property of the Contractor. All materials not salvaged shall be disposed of as specified in Article 202.03 of the Standard Specification for Road and Bridge Construction.