1. Removal and disposal of existing rubber base. Per lin ft._________ 2. Hand removal and disposal of existing glue direct carpet. Per sq. yd.________ 3.Removal and disposal of sheet goods. (Machine Required) - Examples include sheet vinyl, double glue carpet, and tight unitary Per sq. yd._______ 4. Removal and disposal of existing VCT Per sq. ft._______ 5. Scrape away of old adhesives Per sq. ft._______ 6. Removal and disposal of carpet, pad, and tack strip. Per sq. yd._______ 7. Carpet installation glue direct. Per sq. yd._______ 8. Stretch-in installation Per sq. yd._______ 9. Border work installation charge. Per lin. Ft._______ 10. Carpet tile or double glue installation if applicable Per sq. yd._______ 11. Add for attached or double glue cushion. Per sq. yd._______ 12. 4” rubber base and installation. Per lin. Ft._______ 13. 6” rubber base and installation. Per lin. Ft._______ 14. Rubber transition strips and installation Per lin. Ft._______ 15. Stair tread and installation. Per lin. Ft._______ 16. ADA Stair tread and installation Per lin. Ft._______ 17. 24”x24” Rubber Landing Tile Material and Installation Per sq. ft._______ 18. VCT Installation Per sq. ft._______ 19. VCT Pattern Installation Per sq. ft._______ 20. LVT Installation Per sq ft._______ 21. LVT Pattern Installation Per sq ft._______ 22. Rubber/Marmoleum Tile Installation Per sq ft._______ 23. Sheet Vinyl/Marmoleum Sheet Installation Per sq yd._______ 24. Carpet Binding Per lin. Ft._______ 25. Hourly Labor (Furniture Moving, excessive prep, etc.) Per hour_______ 26. Overtime Premium for afterhours work Per sq yd._______ 27. VIT Process (Lift Systems furniture for carpet install) Per sq yd._______ 28. Travel – Round Trip mileage outside 60 miles of Topeka KS Per mile_______ 29. Per Diem – Overnight stay outside 60 miles of Topeka KS Per man_______ 30. Dumpster Set and Removal Fee Per set._______