Specifications include, but are not limited to: Bulletin Desc: Provide Temporary Work Zone Traffic Control, Provide General Excavation, Install Stone Embankment Material (SEM), Abandon Existing 24" HDPE Double Walled Culvert Pipe, 10 ft Depth with Downspout, Remove Existing Asphalt to a limit of 100 lineal feet by 7 feet wide and install Aggregate Base and Commercial Asphalt Concrete Pavement (CACP). Mobilization; Temporary Work Zone Traffic Control, Complete; Erosion Control ; Pollution Control Plan; General Excavation ; Stone Embankment; 24 Inch - HDPE Double Wall - Culvert Pipe, 10 ft Depth with Downslope Pipe; Pipe Slope Anchors, Metal, 24 Inch; Filling Abandoned Structures; Aggregate Base; Commercial Asphalt Concrete Pavement (CACP);