Concrete pavement milling and full-depth pavement removal. Pavement patching is a part of this contract. Contractor shall sawcut pavement 1-foot in front of curb to accept the 4-inch asphalt overlay. Area reflective crack control will be placed prior to an asphalt overlay. Pavement joints shall be removed and replaced as indicated on the plans. Contractor shall remove pavement to accept the proposed pavement cross-sections. Contractor shall replace the full-depth removed pavement with a composite pavement consisting of 8-inches of concrete base course and 2 -inches of asphalt base and 2-inches of asphalt surface course. The existing pavement core report is attached to this RFB. Additional work included removal & replacement of existing sidewalks, curbs & gutters, curbs, and alleys. Tree removal is a part of this contract. Contractor shall perform clearing and grubbing of plant material within the ROW. Storm sewers shall be removed and replaced along with newer sewer and sewer structures at locations shown on the plans.