1.Perform irrigation upgrades and site restoration per the attached site plan and technical specifications at Lakemont-Highlands Park located at 15800 SE 63rd Street, Bellevue, WA, 98006. 2.Contractor shall field verify locations of all existing utilities and structures. Save and protect all utilities and structures not indicated to be modified. Call 811 for general locates. Contractor shall be responsible for providing private locates ifnecessary. 3.Contractor shall notify Owner’s representative of any unusual, unknown, or unsafe conditions discovered duringconstruction. 4.Contractor shall verify all dimensions indicated in the field and adjust dimensions to fit with existing structures indicated to remain, save, and protect. 5.Contractor shall be responsible for providing and maintaining safety fencing, barricades, and directional signage as required to protect the safety of park visitors during construction. 6.Park grounds shall remain open to the public during construction. Contractor shall phase work and provide detour routes as required to provide public access to the park grounds. Verify detour routes with Owner’s Representative prior to construction. 7.Contractor shall clean all construction areas of debris, extra materials, fencing, and wash all paving of dirt and dust following completion of project. 8.Contractor is responsible for all damage due to his/her operations during the project. All repairs shall be made at no additional expense to the Owner. 9.Contractor shall notify Owner’s Representative of discrepancies and shall keep Owner’s Representative informed of progress of work throughout construction activities.