The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required to construct complete, in place, and ready to operate the following: 1. Replace approximately 700 LF of existing sewers with 8-inch PVC gravity sewer (Open Cut in Same Ditch). 2. Replace approximately 55 LF of existing sewers with 8-inch PVC and HDPE gravity sewer (Open Cut New Ditch). 3. Replace approximately 310 LF of existing sewer with 8-inch HDPE by pipe bursting. 4. Rehabilitate approximately 460 LF of existing 8-inch sewer by CIPP method. 5. Rehabilitate approximately 22 VF of manholes by spray lining. 6. All associated service reconnections, sewer abandonment, and erosion and sedimentation controls.