The Scope of Work, including but not limited to: A. Inspection and Assessment • Inspect steel frame for damage and/or repair needs. • Inspect wood frame for damage, rot, weathering, etc • Inspect floats for repair needs. • Inspect plumbing, pipes, fittings, and connections for repair and replacement needs. B. Lumber and Steel Frame • Replace all damaged wood framework, nailers and skirt boards with pre-treated lumber with maximum moisture content 19%. • Use treatment containing no arsenic or chromium. • Replace steel frame that is damaged with new steel. C. Deck Surfaces, Toe Boards, and Cap Rails • Replace all decking, toe boards, and cap rails with new composite with similar specifications as existing on dock to include floating dock, gangway, and landings. • Product shall have grooved edges design for fasteners. • Textured Surface: Manufacturer’s standard.