The College intends to contract for the repairs and improvements associated with ADA travel routes, general walkway smoothness/drainage and removal and replacement of deteriorating unit pavers. JCCC is asking that all bids be broken down by area as indicated on plan (i.e. Area A, Area B, Area C, Area D and Area E) as the College may opt not to perform work in an area due to budget constraints. JCCC is asking for unit pricing for all work items to allow for selective reduction or increase as budget dictates. To accomplish the project the winning bidder will be required to selectively remove and reset unit pave walkways and provide clean pulverized topsoil in areas of disturbance adjacent to the areas of work. The winning bidder will be responsible for providing all necessary barricades, fencing and signage to protect the traveling public from the work areas. The winning bidder will be required to work closely with JCCC Campus Services Staff to coordinate shutdown of areas for work. The winning bidder will be responsible for providing edging pavers. JCCC will provide all Pavestone field pavers for use by the winning bidder. The winning bidder will be required to provide all necessary edge pavers, fill materials (AB-3), bedding materials, joint sand materials and topsoil needed to complete the project. The winning bidder will be required to work with JCCC Groundskeeping Staff to locate and disconnect existing sprinkler systems in areas of work that may be damaged because of the work. The winning bidder will be responsible for protecting existing unit pavers and improvements not being replaced during the work and will be responsible for replacement of all damaged improvements at their cost.