The selected contractor will be responsible for the removal and installation of single-phase 2S electric meters per District standards. The contractor is to provide an experienced management team and skilled labor force to facilitate the installation of approximately 8,000 single-phase 2S electric meters and perform the project safely, accurately, on time, within promised budget and with customer satisfaction. The selected contractor shall provide all labor, supervision, equipment, tools, and materials (vehicles, fuel, PPE, iPad, and meter exchange tools to include voltmeters, socket tension tools, meter pullers, etc.) to perform the meter exchanges and documentation. The District will supply the meters, rings, and seals. On a recurring basis, the District will supply a list of meters needing exchanged to include the meter number, location, etc., to be grouped by area to maximize drive-time efficiencies. Contractor will be responsible for following the below outlined Meter Exchange Procedure and for scheduling work to be performed after receipt of the list of meters. The proposed work hours are four (4) ten-hour days from Monday to Thursday 6:00am – 4:30pm for field installers. The District will provide specific blackout dates if applicable...