Develop and deliver the Preliminary Design, Final Design, and Design Support during Construction, including providing a Preliminary Design Report, design check computations, plans, specifications and estimate (PSE) for project advertise, for the East Deering Pathways to Bridge the Gap Project. The work includes, but is not limited to, the following: (See also Attachments āA & Cā) 1. New Bike/Ped Bridge Across Back Cove - A new bicycle and pedestrian bridge to be located parallel to the east side of Tukey's Bridge (1-295) connecting the Eastern Promenade Trail directly to the Roux Institute Campus is proposed. The bridge is proposed to be 824ft in length and 16 feet in width (12 feet of effective path width) and will better connect East Deering and the Roux Institute to the Portland Peninsula...