Scope of work shall include: 1. Provide a thorough physical Home Inspection & Assessment of the existing structure, review the request from homeowner on request for assistance and develop a Scope of Work per Home up to Maximum Construction Cost not to exceed $90,000– Modifications to certain areas of the structure will be necessary to accommodate for new set up 2. Contractor or Bidder will need to provide for a Cost Breakdown of each home 3. Demolition of interior or exterior of the existing structures if necessary 4. Provide Construction & Progress schedule 5. HTHA will provide Phase inspections 6. An upgrade & Replacement of New Materials on all phases/sections of the existing homes 7. Exterior: Install New Windows, New Exterior Doors, New Roof decking, Replace with New Engineered trusses where deemed necessary, Replace with New fascia boards & soffit boards, New Roof Shingles, New Wall Sheathings where necessary, New Ext. Fiber cemented Sidings with trim, New Primer & Finish paint to match color scheme, Rain Gutters with Down spouts, Gable end vents, soffit vents, Site grading to swale away from house for drainage, Install 4x5 concrete stoops in front & rear, Install 8’x5’ wood porch with handrails & steps at client’s request or ADA Ramp. 8. Interior: Install New Electrical wiring & boxes, upgrade outside SEP, New Plumbing Rough-ins & New Plumbing Fixtures, Plumbing Tests & Inspections, New Rough Framing where necessary, install sound barriers, install new blockings & backings, New Windows, New Exterior Doors with Hardware, New Batt Insulation(wall/ceiling), New Drywall, Taping & Texture, New interior painting with new primer/finish coat, new light fixtures, New LPG Gas or Electric Water heater. New Electric Range Hood. Demolition on all interior existing materials on Drywall, electrical wirings, plumbing above & below the Finish Floor, Batt Insulation, Some Framing wall may have to be moved, New Floor Tiles installation, Existing Concrete or Wood Sub floor to be leveled per floor prep, New closet shelving, New Finish Hardware (Mirrors, Towel Bars, Tissue Holder, Shower Rod, Medicine Cabinets, Door Bumpers & Doorknobs), Install Hollow Core Doors with wood trim, Install new wood stoves with new base & wall hearths 9. Contractor to determine with Client’s preference on the use of Gas or Electric and to provide for the accommodations for the stub outs. 10. Contractor will provide all labor, materials, equipment & tools necessary to complete the project 11. Contractor to provide all sanitary equipment for the project & workers (Trash bin, porta-john & storage) 12. Contractor to comply with all Safety Codes for their Workers (PEP), property and equipment 13. Contractor to be responsible for all material handlings, inventory control on-site 14. Contractor to provide all transportation needs and transporting of materials 15. Provide for Final Job site clean-up and ready for move-in 16. Retainage of 3% from each Pay-App submittal will be retained 17. Warranty Period for 12 months after Project Completion