FOUNDERS CIRCLE PORTIONS OF COLLIERY DRIVE, STONEY CHAPEL WAY, GOODWILL CIRCLE, BLACKFORD CIRCLE, ORE MILL PLACE, IRONMASTER COURT, MINERS COURT, AND PORTION OF WESTVIEW DRIVE AS WELL AS CRACK SEALING IN A PORTION OF COLLIERY DRIVE (see project sketch): • The Contractor shall resurface and crack seal the following streets (length and widths): STREET RESURFACING LENGTH WIDTH Founders Circle 735ft 30ft; Cul-de-sac diameter 80ft Colliery Drive (Founders to seam @ 13 Colliery Drive) 548ft 29ft Stoney Chapel Way 300ft 29ft Goodwill Circle 70ft 30ft; Cul-de-sac diameter 82ft Blackford Circle 410ft 29ft; Cul-de-sac diameter 80ft Ore Mill Place 220ft 29ft; Cul-de-sac diameter 80ft Ironmaster Court 470ft 29ft; Cul-de-sac diameter 80ft Miners Court 150ft 29ft; Cul-de-sac diameter 80ft Colliery Drive (Ironmaster to Westview Drive) 505ft 29ft Westview Drive (98 Westview Drive to Ironmaster Drive) 780ft 29ft CRACK SEALING LENGTH WIDTH Colliery Drive (Seam at 13 Colliery Dr. to Ironmaster Dr./Ct.) 1250ft 30ft • The Contractor shall be responsible for all traffic control. • The Contractor shall post signs to provide public notice of the project start date at Moser Road/ Founders Circle, Stoney Chapel Way/ Moser Road, Westview Drive/ Tacoma St, and Westview Drive/ Ironmaster Drive at least two (2) weeks before beginning any work. • The Contractor shall provide clean, straight seams at all roadway tie-ins. • The Contractor shall mill down 2 inches, gutter pan to gutter pan. • The Contractor shall sweep area to remove all millings and debris.