The improvements consist of furnishing all labor and materials for the installation of solar panels on canopies over the bus parking lot at the DTC Dover Operations and Administration Facility. The project constructs 60,000 SF of steel framed canopy with a galvanized metal roof that will hold 1,424 solar panels. The system includes two - 1.1 MWh batteries creating a Battery Energy Storage System (BESS) and a Smart Energy Control Center (ECC) to remotely charge buses. A Microgrid Control System will allow remote monitoring. There is LED lighting under the canopy. 96 bus parking spaces must be reconfigured for the canopy system. The bus parking lot will need to be paved and striped. The site must be kept operational for bus traffic and maintenance at all times. The contractor is responsible for all necessary permits. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.