Well No. 34 (1215 Lajuana Dr.) mobilization and pump test, perform a pump test to determine well capacity, static water, and pumping water levels. Preliminary video inspection, pull the pump and conduct an initial video inspection of the well. Cleaning and inspection, clean the well casing and screens, followed by a post-cleaning video inspection. Pump and motor upgrades, upgrade the pump and motor to meet required duty conditions. Pump base reconstruction, demolish and reconstruct the existing pump base to meet Georgia EPD minimum standards. Discharge piping replacement, replace discharge piping, valves, fittings, etc., to align with the new pump discharge head elevation as detailed in the plans. Electrical and control improvements, implement electrical and control system upgrades as specified in the plans. Materials, the contractor will provide all materials, except where the plans specify reusing or rebuilding existing items. Final testing and disinfection, after all improvements, the contractor will conduct performance testing, disinfection, sampling, and laboratory testing necessary to place the well back in service