The project scope is inclusive of, but not limited to: Provide a turnkey project inclusive of all labor, materials, traffic control, supervision, disposal fees, permits, inspections for roof work specified ONLY in Alternate #2 per engineered drawings and specifications located at the Henderson building on the campus of Blue Ridge Community College. Contractor should note the upper roof and the east lower roof are not in the scope. The work outlined for the upper roof has been previously done. Contractor is to meet or exceed all requirements and specifications outlined in the engineered drawings and specifications and Pre-bid. Work area and equipment room to be left in a clean and good condition. It will be up to the Contractor to do his own core samples and verify layers and underlayment. Core sampling will be at the Contractor’s expense. Site visits must be arranged ahead of time with the BRCC Capital Project/Construction Coordinator. o All work will match the composition of the previously done upper roof) including new insulation, new coverboard, new membrane roof) and shall include replacement of the existing roof coping. o All edge metal colors will be chosen by BRCC from the manufacturer’s standard color chart. BRCC’s intent is to match the color of the edge metal on the upper roof. o Furnish the necessary supervision, labor, tools, equipment and materials to complete the work outlined in the engineered drawings and pre-bid meeting...