A. Furnish all labor, materials, and equipment, and perform all work to construct, as specified herein and as shown on the accompanying drawings entitled “A New 9,000 SF welding and agriculture building for Clinton High School.” The building shall be constructed complete and ready for occupancy except for the items specifically excluded in "Work Not Included". B. The work shall include site preparation, building construction, plumbing, heating, ventilating and air conditioning; electrical work; special equipment as specified; and site improvements as shown and specified. C. Patch any existing work damaged by construction. 1.02 WORK NOT INCLUDED A. The following items of work will be provided by the Owner or by others under separate contracts: 1. Wayfinding signage. 2. Toilet accessories not included on drawings: OFCI. 3. Movable furniture unless specifically shown on the drawings and specifications. 4. Security System Equipment. 5. Telephone System Equipment. 6. Computer System Equipment. 7. Any other items noted on the drawings as Not in Contract (NIC); or Owner Furnished Contractor Installed (OFCI).