Specifications include, but are not limited to: 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby). Contractors are required, so far as possible; to arrange work and to dispose of materials so as not to interfere with the work or storage of materials of other contractors or City forces engaged upon the work. Contractors shall furnish the services of an experienced engineer or superintendent. The building footprint is approximately 120 feet by 200 feet and for the sake of base bid scope of work is all work is on and 40’-00 around the east elevator. water diversion: 1. Install new epoxy flooring to direct water away from elevator – all floors. 2. Installation new drain. 3. Installation of new railings.