Water main replacement on three roads in Spokane Valley with the installation of 3,250 lineal feet of 8” C-900 pipe together with 22-8” gate valves, 6-12” valves, 8 fire hydrants, 8 existing system connections, 69 service connections, 53 meter assemblies & boxes, 1 DCVA assembly & box, reconnections to existing services lines, 1,000 lineal feet of 1” service pipe, 550 lineal feet of bored service pipe, 960 tons of crushed surfacing, 370 tons of Cl. 3/8” PG64H-28 HMA, 30 tons of Commercial HMA, 130 l.f. curb repair, and 570 s.y. of sod repair. Also included is abandoning existing water mains, removing existing meters & hydrants, traffic control, sprinkler system repairs, misc. concrete repair, hydroseed, and fencing/landscape repairs along with various other incidentals.