4.3.1 Bidder shall remove the 2 Tesla and 2 Universal (total of 4) electric vehicle chargers at eat of the 4 City owned garages listed in section 4.0. The bidder will then install 4 universal, level 2 or higher chargers at each location. No additional electrical work should be required. 4.3.2 Bidder is responsible for all hardware and software requirements for electrical vehicle swap and cleanup. The City of Savannah garage manager will assist with minor traffic assistance (i.e. blocking off area needed for work and will provide access to electrical room). 4.3.3 Bidder shall train City of Savannah staff on managing charger networks. 4.3.4 Bidder shall be responsible for maintenance of installed chargers and provide repairs and troubleshooting when necessary. 4.3.5 Bidder shall provide maintenance, hardware/software warranty, and a data/networking package with option to renew annually.