a. Provide Labor, Tools, and Materials to replace the designated boiler as requested. b. Demolition and Disposal of the existing unit. c. Installation of the new boiler meeting the specifications given below d. Gas and Water Piping reconnections e. Exhaust reconnection f. Crane Service and a complete factory startup of all new equipment g. Installation of a chemical/testing system of the pot feeder variety to allow for testing and chemical introduction h. General requirements and specifications of the new unit: ▪ MIN BTH 1000 ▪ Cast Iron Headers ▪ 88% Efficiency Min. ▪ Finned Copper Tube Heat Exchanger, ASME 160 psi Max WP ▪ 4-Pass Design ▪ Variable Speed Blower ▪ Mounted & Wired Flow Switch ▪ Flame Safeguard Control ▪ Quick-Release Service Latches ▪ Sealed combustion/direct vent ▪ No de-rate to 6000 ft ▪ Low NOx ▪ Seismic Restraint Base Assembly ▪ Integrated Boiler Management System ▪ Category II and IV