Quoddy Hall Apartment 8: 1) New wall to wall kitchen cabinets 2) new countertop and double sink 3) remove all carpet and install luxury vinyl plank on all floors 4) remove wood paneling on walls and repair drywall behind it 5) Move refrigerator and stove to opposite wall 6) install new bathroom doors; entry and bi-fold between vanity and toilet 7) remove existing tiles from bathroom walls and replace with moisture resistant sheetrock 8) repaint bathroom baseboard heaters 9) Install new toilet with pressure assist model 10) install new bathroom countertops; sinks and faucets 11) repair all apartment walls and paint them 12) repair trim and moldings as needed 13) repair suspended ceiling hardware, paint suspended ceiling gridwork, and replace ceiling tiles 14) install new solid core birch veneer bedroom doors using existing frames 15) replace all bedroom windows in B and C 16) replace picture window in living room 17) install a new steel entrance door including metal frame.